Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Aug 30, 2023     Metal fairing for cabin air control cables - (4 hours) Category: Firewall
Thinking about building a little fairing for the cabin air cables penetration. Idea is to rivet it on the fiberfrax and fill it with Firebarrier2000 instead of leaving the two cables just there with a little bit of RTV as suggested by VANS.
I did a mock up in aluminum just to see how it could fit.
I need to create a little tool to facilitate the forming of the steel foil taken from the oil recess part that i screwed up earlier in the project
Aluminum mock up seems to be ok.
Carved an hard wood block with the shape and formed the fairing, Deburred and cut to measure.
Lucio agrees this is a valid solution and a better way to manage this passthrough compared to the solution proposed by VANS
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.